GMP Support for a New Sterile Facility

Developing Procedural and GMP Documentation to Support a First TGA GMP Licence

  • Client: One of Australia's largest international biotechnology and sterile medicines manufacturers

  • Sector: Biotechnology / sterile vaccine and biologics manufacturing

  • Project type: Audit readiness for a new sterile facility. Process mapping, PQS procedure development and consolidation, and GMP support documentation

  • Standards: PIC/S Guide to GMP, including Annex 1: Manufacture of Sterile Medicinal Products and the TGA manufacturing licence requirements

  • Outcome: More than 100 PQS and GMP documents drafted, reworked or merged, an Annex 1 Contamination Control Strategy (CCS) and supporting FMEA, and over 40 extractables and leachables (E&L) risk assessments. The site was granted its TGA manufacturing licence shortly after.

The Challenge

Our client was commissioning a brand-new sterile manufacturing facility for vaccines within its new Centre for Research and Development, which houses laboratories and research and clinical-phase production suites. Before it could manufacture, the site needed a TGA manufacturing licence, and every system on site needed approved GMP procedures behind it.

The PQS documents carried over from the client's previous vaccine site were written for different facilities, equipment and ways of working, and needed to be completely reworked. Many processes had not yet been mapped. Documents were due against fixed milestones, including utility and environmental monitoring PQs and laboratory and manufacturing audits, while the site moved to a new eQMS and its SMEs were busy commissioning. As a sterile facility, the site also had to meet the revised Annex 1, including a documented Contamination Control Strategy.

Our Approach

QSN worked with the client's Building Operations, Technology Transfer and Quality Assurance teams across two linked engagements. We conducted site visits with site SMEs, drafted new or reworked documentation, and routed documents through SME review to QA approval. QSN's deliverables were reported weekly against the site's readiness milestones.

Process Mapping & Gap Review

  • Supported process mapping with site SMEs and reviewed existing document lists and procedures.

  • Set the approach for each document: write new, merge overlapping documents, or rework PQS documents inherited from the previous site.

Engineering & Utility Systems

  • Drafted system overviews and operating procedures for purified water, gases, compressed air, laboratory vacuum, process heating and cooling, steam, bulk chemicals, and effluent and waste systems.

  • Developed the associated start-up checklists, pressure test records, and filter replacement and flushing records.

Maintenance & Calibration

  • Drafted maintenance and calibration procedures, including HEPA filter management and leak testing, cleanroom airflow measurement, maintenance in classified areas, preventive maintenance and work orders.

  • Covered critical equipment and utilities, including autoclaves, biosafety cabinets, isolators, WFI and pure steam, in line with Annex 1 expectations for classified areas.

  • Merged dozens of individual maintenance documents into a smaller set of system-based SOPs.

Facilities Management & Warehouse

  • Developed SOPs, work instructions, logs and training assessments for cleaning of classified, non-classified and PC2 areas, gowning, and waste management.

  • Drafted facility management, kitting, inventory management, and labelling and signage SOPs.

  • Developed warehouse procedures for cold storage, SAP inventory management, stock counts, loading bay access and dry ice handling.

Annex 1 Contamination Control Strategy & E&L Assessments

  • Drafted the site's Annex 1 Contamination Control Strategy (CCS) and supporting cross-contamination FMEA.

  • Completed more than 40 E&L risk assessments for R&D single-use and product-contact materials, including tubing sets, filter assemblies, depth filters, mixing vessels, chromatography resins and probes.

  • Reviewed supplier extractables data for compounds of concern and followed up missing vendor information.

The Outcome

  • More than 100 PQS procedures, work instructions, forms and logs written, reworked or merged across engineering, maintenance, facilities management and warehouse operations.

  • Legacy PQS documents from the previous site rebuilt to fit the new facility, with overlapping documents consolidated.

  • An Annex 1 Contamination Control Strategy and FMEA, and more than 40 E&L risk assessments, prepared for SME and QA approval.

  • The site was granted its TGA manufacturing licence shortly after QSN's work was completed in 2024.

Bringing a new GMP facility online?

Whether you're preparing for your first TGA inspection, reworking legacy procedures for a new site, or need GMP technical writers who can work alongside your SMEs, QSN can help you get there.

Check out our relevant services - Site Licensing and Accreditation, Regulatory Compliance and Auditing or QMS.

Or check out our retainer options for Audit4Life and Compliance4Life.

Resources: QSN Academy · Blog · Webinars · eBooks · Scorecards · Book

Connect: LinkedIn (QSN) · LinkedIn (QSN Academy) · Linkedin (Dr Kathy Walsh) · Facebook · Email at info@qualitysystemsnow.com.au · Contact Us

Legal: Privacy Policy · Terms & Conditions · Complaints Procedure · Sitemap · QSN ABN 42 621 334 754